NEWSPublished: 16 Apr 11
512 views
ABB wins $120-million power transmission order in ChinaABB won a $120 million order to engineer and supply key equipment for the Jinping-Sunan 800 kV UHVDC power transmission project of the SGCC. The order was booked in the first quarter.
The system and key equipment will be designed in close cooperation with State Grid Corporation of China and local Chinese partners, and ABB will also supply key components for both converter stations, including converter valves, the control and protection system and DC yard equipment. As separately announced, ABB has also been selected to supply the 800 kilovolt Ultra High Voltage Direct Current transformers for both converter stations. The 2,090 km power link will transport clean hydropower from Sichuan province in central-western China to the highly industrialized coastal area in the eastern province of Jiangsu. The UHVDC link will have a rated capacity of 7,200 megawatts, and is expected to be energized in 2013. Do you know more about this story? Contact us anonymously through this link. Click here to learn about advertising, content sponsorship, events & rountables, custom media solutions, whitepaper writing, sales leads or eDM opportunities with us. Tags: China power transmission project, Ultra High Voltage Direct Current, power transmission order |