Staff Reporter
Solar PV: Ultimate goal to reach grid parity
Solar PV: Ultimate goal to reach grid parity
The long-term outlook for the solar PV industry as a whole looks bright in Rabobank’s view, even though the next couple of years are likely to be turbulent, especially for manufacturing companies.
On-site renewable energy trends for the Asian power market
Renewable energy attracted over $250 billion in global private sector investment in 2011 according to the United Nation’s REN21 report by the World Resources Institute as well as by a separate analysis by Bloomberg Energy.
The Hong Kong “generation” gap
In years past that referred to the difference between the thinking of the older generation and the younger generation. Today it can be used to describe the difference between how much electricity is being generated versus how much is needed.
The role of south Asian power sector
Energy is one of the key contributors to sustainable development. Energy is an essential input to maintain and improve living standards of people, particularly the poor and the vulnerable and to develop to socioeconomic infrastructure required for sustainable growth. Over 2.7 billion people still rely on traditional use of biomass for cooking.
Options for meeting renewable purchase obligations in India
Under the Electricity Act (2003), the governing legislature for the Indian power sector, State Electricity Regulatory Commissions (SERCs) are mandated to promote renewable energy (RE) through the setting of Renewable Purchase Obligations (RPOs). Under these policies, certain parties (obligated entities) are obligated to purchase a minimum share of their electricity from renewable energy sources.
U.S. investment arm lends US$250 million to Indian RE projects
The Overseas Private Investment Corporation has injected long-term capital to help unlock India's huge renewable energy potential.
Philippines delays transmission system improvement by 5 years
The time frame for improving the electricity transmission system in the Philippines has been extended from 10 to 15 years.
Coal-fired power project in Mindanao certified as environment compliant
The $280-million San Ramon Power plant of Alsons Group has secured an Environment Compliance Certificate.
Japan's nuke plants not ready for quake, reports warn
Two official studies predicted higher waves and earthquakes that could bigger that its nuclear power plants are prepared for.
India's CEA wants to limit PPA for gas-based plants to 15-18 years
CEA's draft of the National Electricity Plan of 2012 suggested that the duration of a PPA should be brought down from the existing 25 years to 15-18 years.
GoUK advocates award of stage-II clearance for THDC's 444 MW Vishnugad Pipalkot HEP
The Government of Uttarakhand (GoUK) has recommended to the Ministry of Environment and Forests (MoEF) to award stage-II forest
GoUK advocates award of stage-II clearance for THDC's 444 MW Vishnugad Pipalkot HEP
The Government of Uttarakhand (GoUK) has recommended to the Ministry of Environment and Forests (MoEF) to award stage-II forest
NTPC seeks GoM's help for expeditious grant of forest clearance for Kolodyne-II HEP
State-run NTPC has sought the help of the Government of Mizoram (GoM) in expediting the forestry clearance for the former's
SJVN yet to conclude hydro testing, falls behind concretization targets at Rampur HEP
SJVN has been lagging behind the targets set for the generator barrel concreting at units 1, 2 and 6 of its 412 MW Rampur hydro
BHEL's lackadaisical attitude a cause of serious concern for NTPC's Rihand STPP
In yet another disappointing turn of events for NTPC`s Rihand super thermal power plant (STPP), power equipment major BHEL has failed
Completed CDM for 6 Projects Totaling Over RMB30 Million Revenues
Since the beginning of 2012, CPCEC’s Beijing-based Carbon Asset Operation and Management Co., Ltd. (Carbon Asset Company) has completed a new
Hinduja Energy forms JV with STEAG for 10,000MW projects
Hinduja Energy has formed a joint venture with STEAG Energy Services for setting up 10,000 MW power plants. It The projects will require an investment of $12-14 billion during the next eight years.
Commentary
Malaysia’s energy workforce is upskilling, but to what standard?
Asia’s grid decade: Why transmission will decide the pace of renewable growth
The supply-side blind spot in ASEAN’s data centre boom