Caterpillar launches natural gas 1000kW standby generator set for 60 Hz market

Caterpillar Energy Solutions is pleased to announce the Cat® G3512 generator set is now available for standby and load management applications with emissions as low as 0.5 g/bhp-hr NOx.

Rated for standby or continuous power at 750 ekW or 1000 ekW at 60 Hz, the G3512 is engineered to meet a full suite of critical market standards including NFPA 110 Level 1 Type 10 compatibility, and a UL 2200 listing. The G3512 series conforms to ISO 8528-5 G3 load acceptance criteria, improving transient and steady state performance.

“Our G3512 generator is uniquely engineered for flexible applications, where a single unit is used for both standby and load management operations,” said Mike Yohe, Caterpillar product development manager. “This generator was designed for maximum performance on low pressure gaseous fuel supply. The robust high-speed block design provides prolonged life of the unit and lowers overall owning and operating costs for our customers,” said Yohe.

The G3512 is ideal for load management and is suitable for office buildings, data centers, retail complexes, schools, government buildings, universities and research facilities. With an updated package design, the G3512 is modeled after the diesel solution to minimize installation costs and commissioning time on-site. A high-power density 12-cylinder engine offers market leading load acceptance and transient response. Designed for reliability, this engine is built on Caterpillar’s legendary 3500 platform technology and features a robust design with steel pistons and a protection monitoring system.

Featuring Caterpillar’s EMCP 4.3 generator set controller, the G3512 easily integrates with building management systems. The expanded set of features also includes complete SR5 generators, gas train, package-mounted radiators and simplified wiring connections.

The G3512 is compatible with NFPA 110 Level 1 Type 10 applications, where backup power is required for mandatory building functions such as egress lighting, elevators, ventilation or data equipment, among others. The G3512 generator set starts and accepts power load in as quickly as 6.5 seconds, depending on conditions at the site.

Caterpillar is leading the power generation provider with market leading power systems engineered to deliver unmatched flexibility, expandability, reliability and cost-effectiveness. With parts and service available globally, Caterpillar offers worldwide product support through its comprehensive service and dealer network, where technicians are trained to service every aspect of the equipment.

Join Asian Power community
Since you're here...

...there are many ways you can work with us to advertise your company and connect to your customers. Our team can help you dight and create an advertising campaign, in print and digital, on this website and in print magazine.

We can also organize a real life or digital event for you and find thought leader speakers as well as industry leaders, who could be your potential partners, to join the event. We also run some awards programmes which give you an opportunity to be recognized for your achievements during the year and you can join this as a participant or a sponsor.

Let us help you drive your business forward with a good partnership!

Top News

JERA launches India subsidiary
The subsidiary will engage with local governments and companies in India.
Project
China's carbon market tightening to boost RE demand
Press reports suggest that China is looking into reducing the free emission allowance.
Regulation

Exclusives

India removes licence requirement to build transmission lines for bulk consumers
The rule applies to those with at least 25 MW of load for inter-state connection and at least 10 MW for intra-state.
NEFIN Group works double time to catch up on projects
CEO Glenn Lim explains how a delay turned out good as the company aims to reach 667 MW of capacity by 2026.
Summit Power International provides vital LNG support to Bangladesh