Project

CNOOC’s Huizhou 26-6 Oilfield starts production

Peak production will be reached in 2027.

ADB inks $820m loan for 12 renewable energy projects in Thailand

This will fund solar and battery storage projects.

MGen eyes 1.5 GW of additional renewable energy capacity

It also plans to expand the Toledo coal-fired plant.

APAC’s wind energy potential hampered by supply chain bottlenecks

It is expected to add 61% of global wind capacity by 2030.

ADB OKs $200m loan to upgrade Sri Lanka’s power infrastructure

Half of the country’s generation last year came from thermal power.

Singapore told not to be a test bed for small modular reactors

There are other power sources that are easier and cheaper to deploy, experts said.

India's first variable speed PSP goes online

The Tehri Hydro Power Complex has an installed capacity of 2,400 MW.